Generator 10-60kVA diesel generator set by Yanmar engine
Fuan Dongchai Power Co., Ltd. offers Yanmar generator 10-60kVA diesel generators. Self-starting diesel generators with 1-year/1000-hour warranty. China generator factory.
Frequency |
50Hz /60Hz(1500RPM/1800RPM) |
Voltage |
440V/415V/400V/380V/240V/230V/220V/200V |
Cooling way |
Water cooled,Air cooled |
Breaker |
A.B.B,CHINT,Delixi |
ATS |
Optional - (AISIKAI) |
engine |
generator power by Cumnins,Deutz,Kubota,Yanmar,Mitsubishi,Doosan,Weichai,Baudouin,KOFO,Shangchai,Yuchai,
Faw,Yangdong,Quanchai,Yunnei |
Alternator |
Stanford,Leroy Somer,Meccalte,Dongchai,Kanpor |
Controller |
ComAp,Deepsea,Smartgen,Datakom |
1 year or 1000 working hours, whichever comes first. After expiration, provides cost maintenance
service description within the guarantee period
12 months . If the quality problem arise during the warranty period,and verified the problem is caused by our genset-body instead of external or natural reasons. (Refer to all kinds of natural disaster, shipping, loading, unloading, wrong-operation, etc), we will supply the relevant spare parts free of charge for spare parts (Shipping not included). But not including quick-wear parts,(such as water tank, gasket, AVR, bridge group, brush, air breaker,meters, and so on.)
6 months warranty for start motor,charging alternator,injector,controller and water heater. (Shipping not included)
Q1: What is your generator MOQ?
A: 1 set.
Q2: What is the lead time?
A:20 days after receiving your deposit.But if your order is some special engine and alternator, then the delivery time is longer.
Q3: Is it able to make customer's own brand?
A: Yes,but need your authorization of brand.
Q4: Where is your Loading Port?
A: Any port in China. Usually Fuzhou port.
Q5: What is your payment term?
A: We can accept T/T 30% in advance, and the balance 70% shall be paid before shipment or L/C at sight.
Q6: What the size of your factory?
A:Dongchai has 14800SQM and 80 staffs.
Welcome to Fuan Dongchai Power Co., Ltd.
FAQ
Our generator specifications:
- Minimum Order Quantity: 1 set
- Lead Time: 20 days after deposit; longer for special engine and alternator orders
- Brand Customization: Available with authorization
- Loading Port: Any port in China, typically Fuzhou port
- Payment Term: T/T 30% in advance, 70% before shipment or L/C at sight
- Factory Size: 14800SQM with 80 staffs
Contact us today to learn more about our high-quality generators!